Railway work experiences

  • Study and design of the 1st and 2nd stages of stations, as well as studies and operations of mapping, geotechnics, passive defense and management on it, in the construction of Kermanshah Monorail
  • Client’s Consultancy on Line A of Qom urban railway
  • Providing consulting services for the client, in the design and construction of Tabriz urban train, Line 2
  • Client’s Consultancy on design and construction of Karaj Underground Rail Network, Line 2
  • Client’s Consultancy Services for making a contract, case studies, workshop supervision and project control of Azarbayjan Railway Administration
  • Carrying out studies on the 1st stage of the entire line A of Qom urban train
  • Design studies of substructure and superstructure of Karaj and suburbs urban train, line 6 entirely
  • Providing plan management services on Isfahan urban train, Line 1
  • Studies on 1st, 2nd and 3rd stages of architecture, structures and all facilities and equipment of Shiraz metro stations
  • 1st and 2nd Stage Studies of civil depo and parking design in new towns of Golbahar, Baharestan, Foulad Shahr and Majlesi
  • 1st and 2nd stage studies of control and electrical signs design, communication, electrify, ventilation and lighting, depo and parking equipment and rolling stock in new towns of Golbahar and Baharestan, Foulad Shahr and Majlesi
  • Carrying out the 1st and 2nd stage studies of the MRT, BRT, LRT stations and terminal of Binalood urban train
  • The 3rd stage services of installation, testing and commissioning of electrical signs of stations in :

-Badrood-Meybod   Ardakan-Chadormloo   Bafgh-Zarand

-Mashhad-Sarakhs       

  * 1st and 2nd stages study of depot and parking of the railways between Atrak and Barekat in Turkmenistan

  * Providing detailed design services for the construction of the railways in the suburbs of Pishwa-Kavir and Pishwa-Varamin

 

Work experiences in Buildings and Technical Structures

  • Carrying out Engineering Studies of 1st and 2nd stages of Haghani commercial, administrative, residential Complex
  • Providing workshop supervision services on foundation constructing and concrete frame constructing of Atlas Plaza Complex
  • Providing supervision services on digging and holding structure of Setareh Pars Complex
  • Study and Design of the 1st and 2nd stages of Sirjan recreational, touristic commercial Complex
  • Providing services on 1st ,2nd and 3rd stages of Lotf Abad business hall, passenger hall, surrounding buildings and border terminal area
  • Providing services on stage 3 (workshop supervision) of athletes residence and parking in Ab Ali sport complex
  • Workshop Supervision on constructing communication and information technology (ICT) complex in Kermanshah
  • Athletes residence and indoor swimming pool of Mahmood Abad complex
  • Study and design of 1st and 2nd stages of Southern Pars office building, workshop, restaurant and warehouse
  • Workshop Supervision on Southern Pars-Asalooyeh office building, workshop, restaurant and warehouse
  • Study and design of the 2nd stage of Shahid Chamran office buildings, Landscaping and Revision of the existing hall design
  • Providing workshop supervision services on Arvand free zone building projects
  • Road design, Laboratory set, Office spaces, Support and Warehouse of Saipa company
  • Study and design of 1st and 2nd stages of Gonbad Kavoos administrative forensic building
  • Carrying out studies on 1st and 2nd stages of an asset building located in Kangan and Borazjan in Booshehr

 

 

  • Study and design of 1st and 2nd stages of Khaark educational building and library
  • Design of 1st and 2nd stages of Saadeghieh multi-story carpark
  • Carrying out supervision and monitoring studies on Saadeghieh multi-story carpark
  • Study and design of 1st and 2nd stages of Khaark VHF Radio station building and the surroundings
  • Design, design control and retrofitting of constructing Tehran hotel in Karbala
  • Providing consulting engineering services including workshop supervision of constructing Karbala Aldovali Hotel in Karbala
  • Providing services of project management in constructing Bandar Abbas stadium with the capacity of 20000 spectators
  • Design studies on Estahban sport and cultural Complex
  • Carrying out supervision on Mehr residential projects and landscaping in new town of Sadra
  • Supervisory services on Mehr residential, located in the south of Development Plan
  • Providing consulting services and pre-feasibility and feasibility studies of Vanak-Molasadra project in cooperation with HTD German consultant
  • 1st and 2nd stages services on Lorestan Veterans Affairs Foundation residential project with 750 units
  • Constructing Boroojerd 170 kw hydroelectric power plant by BOO method
  • Design and construction of Shahid Rajayi Dam hydroelectric power plant (EPC) and participation in the construction of power plants
  • Carrying out 1st stage study of Shiraz International trade center
  • Study and design of 66 Gas refueling stations
  • Consulting services on a series of projects in Khorram Shahr port and Khark and Asalooye port
  • Designing bridges